MODEC and Terra Drone Enter Joint R&D Agreement to Enhance Offshore Platform Ins...
A quantification of emissions of the three GHGs – methane, nitrous oxide and HFC...
Gato do Mato FPSO will be moored at a water depth of approximately 2,000m, some ...
The FPSO “Errea Wittu” will produce approximately 250,000 barrels of oil per day
ABS Certification for Repair Method for Localized Damaged Parts Due to Corrosion
Moored some 150 kilometers off the coast of Rio de Janeiro, at a water depth of ...
The FPSO vessel will be deployed at the field, located in the giant "pre-salt" r...
MODEC will design and construct the FPSO based on its M350 new-build design. Uar...
MODEC, JERA, Toyo Construction, and Furukawa Electric Industry today launched a ...
MODEC was responsible for the engineering, procurement, construction, mobilizati...
MODEC, in conjunction with Toray, has developed a repair method to restore hull ...
The Sangomar Field Development is expected to be Senegal’s first offshore oil de...
MAN Energy Solutions has received an order for a total of six compressor trains ...
The modules will travel from McDermott's Altamira fabrication facility to Singap...
This research and development will be carried out for two years until March 2022