Tag: MODEC

MODEC innovates offshore inspections with Drone Tech

MODEC and Terra Drone Enter Joint R&D Agreement to Enhance Offshore Platform Ins...

GHG Emissions quantification project completed at FPSOs...

A quantification of emissions of the three GHGs – methane, nitrous oxide and HFC...

MODEC secures FEED for Shell’s Gato do Mato FPSO projec...

Gato do Mato FPSO will be moored at a water depth of approximately 2,000m, some ...

Jumbo Offshore awarded mooring pre-installation contrac...

The FPSO “Errea Wittu” will produce approximately 250,000 barrels of oil per day

MODEC and Toray jointly develop FPSO and FSO repair tec...

ABS Certification for Repair Method for Localized Damaged Parts Due to Corrosion

MODEC’s FPSO Anita Garibaldi MV33 achieves First Oil

Moored some 150 kilometers off the coast of Rio de Janeiro, at a water depth of ...

MODEC awarded contract by Equinor to supply the 2nd FPS...

The FPSO vessel will be deployed at the field, located in the giant "pre-salt" r...

MODEC awarded FEED contract for ExxonMobil’s Uaru proje...

MODEC will design and construct the FPSO based on its M350 new-build design. Uar...

JERA consortium starts Japanese floater surveys

MODEC, JERA, Toyo Construction, and Furukawa Electric Industry today launched a ...

MODEC’s FPSO Carioca MV30 achieves First Oil and starts...

MODEC was responsible for the engineering, procurement, construction, mobilizati...

MODEC obtains approval by ABS for new offshore repair m...

MODEC, in conjunction with Toray, has developed a repair method to restore hull ...

New contract for Sangomar Field Development FPSO to be ...

The Sangomar Field Development is expected to be Senegal’s first offshore oil de...

MAN compression technology for Senegal’s first offshore...

MAN Energy Solutions has received an order for a total of six compressor trains ...

McDermott announces second shipment of MODEC FPSO modules

The modules will travel from McDermott's Altamira fabrication facility to Singap...

Launch of research and development to reduce cost of fl...

This research and development will be carried out for two years until March 2022

By using this website, you agree that we and our partners may set cookies for purposes such as customising content and advertising. I Understand