NewBuilds

Hong Kong debuts first electric ferry

Several other electric ferries are due to operate in Hong Kong waters over the n...

Seaspan begins construction on heavy polar icebreaker

This marks the first time a heavy polar icebreaker has been built in Canada in m...

Fincantieri and Viking announce the world’s first hydro...

The vessel is currently under construction at the Fincantieri Ancona shipyard, w...

DFO contracts VARD for one offshore subsea construction...

VARD has signed a contract with the Taiwanese based company Dong Fang Offshore f...

CMA CGM's new container ship Tiga delivered

Bureau Veritas Marine & Offshore (BV) has successfully delivered the CMA CGM TIG...

Kongsberg secures equipment contract for new Offshore S...

Kongsberg Maritime has secured a contract to supply an integrated package of equ...

Stena Line develops new concept vessel

Through optimal design and new technology, the new concept vessel Stena Futuro c...

MPCC, NCL and Elkem inaugurate the first of two dual-fu...

The container feeder vessel is the first of two MPCC dual-fuel 1,300 TEU newbuil...

First commercial-use ammonia-fueled tugboat completes t...

NYK and IPS analyzed the ammonia co-firing and GHG-reduction rates during vessel...

Maersk names dual-fuel methanol vessel “Adrian Mærsk”

“Adrian Mærsk” has a capacity of over 16,000 TEUs and will serve the Asia-Medite...

Noatum Maritime takes delivery of first LNG powered ves...

The vessel will join the existing fleet being operated by United Global Ro-Ro an...

Naming ceremony for Damen electric Fast Ferry

The route that the ferry will serve – between Norddeich and the island of Norder...

Stena Line orders Norsepower rotor sails for RoRo newbu...

Norsepower and Swedish shipowner Stena Line have signed an agreement for the del...

New pilot ship 'Hamburg Pilot 3' in the Port of Hamburg

The almost 18 metre long vessel is the first of two new pilot ships in the Port ...

AtoB@C Shipping welcomes hybrid multi-purpose carrier t...

Terramar, like its sister vessels, boasts advanced hybrid propulsion and shore p...

The construction of the next CSOV for BS Offshore start...

The vessel is designed by Ulstein Design & Solutions AS for ‘walk-to-work’ (W2W)...

By using this website, you agree that we and our partners may set cookies for purposes such as customising content and advertising. I Understand